Skip to main content

With Fully Encapsulated Pipe & Tank Insulation, Installation is Fast, Safe & Efficient

Dragon Jacket Insulation installs in minutes with standard tools and personnel. Durable and reusable, our products last longer than the competition and can be safely removed and reinstalled over and over, with minimal downtime. Check out our real-world installation cost comparison, and see the difference for yourself!

FOR SPEED, SAFETY, AND SAVINGS, THERE’S JUST ONE OPTION – DRAGON JACKET

Download Our Installation Comparison

Engineered For Efficiency

Other insulation products can become compromised after just six months, resulting in an expensive and time-consuming cycle of removal, disposal, and reinstallation. Our patented, fully encapsulated insulation products can be easily removed and reinstalled in minutes – not hours or days – significantly reducing the cost, mess, and downtime related to maintenance, inspections, and insulation disposal.

View Installation Training Videos
Jobsite Safety

Designed with Safety in Mind

Our fully encapsulated insulation products minimize safety hazards by reducing team exposure to hot and cold surfaces during daily operations, inspections, and maintenance. This ease of use minimizes production interruptions and makes the entire inspection and repair process more time and cost-efficient.

SWITCHING TO DRAGON JACKET INSULATION IS ONE OF THE EASIEST WAYS TO MAKE JOB SITE SAFETY IMPROVEMENTS

Safety issues are frequently addressed after companies complete OSHA’s Process Hazard Analysis and Job Safety Analysis. When reviewing job site hazards and identifying the safest routes for successful implementation, materials including insulation must be evaluated to ensure all risk is being mitigated both for initial project setup and daily operations.

Each location and application have their own unique safety concerns. By engineering much simpler, safer, and faster-to-install insulation systems, we provide a standard and consistent product and process to help reduce insulation-related safety hazards in all environments – from the initial installation throughout daily operations, maintenance, and inspection cycles.

“Any problems that are corrected easily should be corrected as soon as possible.”   – OSHA 3071, Job Hazard Analysis

100% Fully Encapsulated

Dragon Jacket insulation is so easy to install because it requires no additional cladding. Our foam core is protected inside and out with a polyurea coating built right into the system. To install, simply secure the insulation with metal bands or zip ties and call it a day!

Dragon Jacket Makes it Easy and Safe to Maintain the Integrity of Your Pipe and Tank Systems

PIPE INSPECTION CAN BE COMPLETED IN MINUTES

  1. Cut the zip ties or metal bands.
  2. Remove the section of insulation.
  3. Inspect the pipe and make any necessary repairs.
  4. Replace the section of insulation.
  5. Re-secure with new zip ties or metal bands.

Dragon Jacket Insulation is Pre-Engineered for Easy Install Over Complex Systems

Installs Over Unistruts

Installs Over Valves

Installs Over Vic™ Style Valves